Tender Notices
Tenders are invited from suppliers / contractors registered with the Ministry of Finance (MOF) or Kementerian Kewangan (KK) / Pusat Khidmat Kontraktor (PKK), Tenaga Nasional Berhad (TNB) and Construction Industry Development Board Malaysia (CIDB) for supply / work as follows:-
| Tender No | Tender Title | Closing Date | |
|---|---|---|---|
| PA / 035 | TAWARAN PELUPUSAN ASET PEJABAT OPERASI WILAYAH ICT IPOH BAGI. 1. SETOR SILIBIN IPOH,BAHAGIAN ICT TENAGA NASIONAL BERHAD. |
28 May 2013 | View details |
| TNBH/SSJCH 16/2013 (Q) | TO REFURBISH TURBINE GUIDE BEARING SPARES FOR HABU STATION | 28 May 2013 | View details |
| TNBT/IP/202/2013/JRE | KERJA-KERJA MEMBEKAL BOTOL SAMPEL MINYAK ALATUBAH DAN AKSESORI DI PENCAWANG MASUK UTAMA DI BAWAH PEJABAT PENGURUS NEGERI (PERAK) JABATAN SENGGARAAN ASET, BAHAGIAN PENGHANTARAN |
28 May 2013 | View details |
| TNBT/IP/203/2013/JS1 | KERJA-KERJA TROUBLESHOOT, MEMBEKAL , MEMBAIKI DAN MEMULATUGAS CCTV DI PMU AIR TAWAR (ATWR) DIBAWAH PEJABAT PENGURUS NEGERI (PERAK), JABATAN SENGGARAAN ASET, BAHAGIAN PENGHANTRAN TNB | 28 May 2013 | View details |
| T1254213 (TNBT 803213) | Cadangan Kerja-kerja Membaikpulih Hakisan Tebing Sungai Di Sekitar Menara No.87 & 88 Talian 132kV PROI – KPLH, N.Sembilan | 29 May 2013 | View details |
| TNBJ/SJM 76/13 | MEMBEKAL TENAGA KERJA KONTRAK UNTUK KERJA-KERJA MANUAL ASHING UNTUK BAHAGIAN SENGGARAAN DANDANG (Terbuka Kepada Kontraktor Negeri Perak Sahaja) |
29 May 2013 | View details |
| TNBJ/SJM 77/13 | TO SUPPLY FAG BEARINGS FOR COAL AND ASH MAINTENANCE SECTION. | 29 May 2013 | View details |
| TNBT/SELG (P) 224/13 | KERJA KERJA MEMBAIKPULIH SERTA KERJA KERJA AWAM YANG BERKAITAN DI BANGUNAN KAWALAN DAN SEKITAR KAWASAN PENCAWANG MASUK UTAMA BUKIT CHANGGANG, JABATAN SENGGARAAN ASET (SELANGOR), BAHAGIAN PENGHANTARAN TNB. | 29 May 2013 | View details |
| TNBT/SELG (P) 223/13 | KERJA KERJA MEMBAIKPULIH DAN MENGECAT DI PMU BANTING TERMASUK KERJA KERJA AWAM YANG BERKAITAN BAGI PEJABAT PENGURUS NEGERI (SELANGOR), JABATAN SENGGARAAN ASET, BAHAGIAN PENGHANTARAN TNB. | 29 May 2013 | View details |
| TNBT/SELG (T) 05/14 | KERJA KERJA MEMBEKAL 2 UNIT KAMERA DIGITAL, 2 UNIT BINOCULAR DAN 3 UNIT HEIGHT METER BAGI UNIT TALIAN, JABATAN SENGGARAAN ASET (SELANGOR), BAHAGIAN PENGHANTARAN TNB. | 29 May 2013 | View details |
| TNBJ/SJM 75/13 | MEMBEKAL TENAGA KERJA KONTRAK BAGI KERJA-KERJA MEMBERSIH KAWASAN DANDANG UNTUK BAHAGIAN SENGGARAAN DANDANG. | 29 May 2013 | View details |
| TNBG/SJP Q56-2013 | KERJA-KERJA MEMBAIKPULIH BERANDA & LONGKANG BALAI ISLAM DI STESEN JANAELEKTRIK SULTAN ISMAIL PAKA TERENGGANU |
29 May 2013 | View details |
| TNBT/KL(P) 129/13 | KERJA-KERJA MEMBEKAL DAN MEMASANG “FIRE ALARM PANEL” DENGAN “MIMIC DIGRAM PANEL” UNTUK SISTEM PENCEGAH KEBAKARAN BAGI PENCAWANG MASUK UTAMA LRT KERINCHI (LKRC) DI BAWAH JAGAAN PEJABAT PENGURUS NEGERI (KUALA LUMPUR) JABATAN SENGGARAAN ASET, BAHAGIAN PENGHANTARAN, TNB. | 29 May 2013 | View details |
| TNBJ/SJM 78/13 | TAWARAN SEBUTHARGA BERJADUAL SELAMA 2 TAHUN BAGI MEMBEKALKAN PERALATAN ALAT TULIS UNTUK BAHAGIAN SUMBER MANUSIA & PENTADBIRAN. | 29 May 2013 | View details |
| TNBG/CBS/T107/2013 | TO SUPPLY ABB BUSDUCT COMPRESSOR SPARE PART AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG, SELANGOR DARUL EHSAN. | 29 May 2013 | View details |
| TNBG/CBS/Q109/2013 | TO SUPPLY COTTON GLOVE & COTTON RAG AT STESEN JANAELEKTRIK JAMBATAN CONNUGHT, KLANG, SELANGOR DARUL EHSAN. | 29 May 2013 | View details |
| TNBG/CBS/Q110/2013 | TO SUPPLY DISPOSABLE OVERALL AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG, SELANGOR DARUL EHSAN. | 29 May 2013 | View details |
| TNBG/CBS/Q111/2013 | TO SUPPLY LIQUID SOAP AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG, SELANGOR DARUL EHSAN. | 29 May 2013 | View details |
| TNBG/CBS/Q112/2013 | TO SUPPLY & INSTALL STAINLESS STEEL TUBING & ACCESSORIES COMPLETE WITH MAINFOLD FOR CIRCULATION FLOW SENSING LINE AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG, SELANGOR DARUL EHSAN. | 29 May 2013 | View details |
| TNBG/SJP Q57-2013 | TO SUPPLY HP NOZZLE DIAPHRAGM HEXAGON SOCKET BOLT FOR STMS, DI STESEN JANAELEKTRIK SULTAN ISMAIL PAKA TERENGGANU | 29 May 2013 | View details |
| TNBT/SELG (P) 245/13 | KERJA KERJA MEMBAIKPULIH SERTA KERJA KERJA AWAM YANG BERKAITAN DI BANGUNAN KAWALAN DAN SEKITAR KAWASAN PENCAWANG MASUK UTAMA SUBANG JAYA TOWN CENTRE, JABATAN SENGGARAAN ASET (SELANGOR), BAHAGIAN PENGHANTARAN TNB. | 29 May 2013 | View details |
| TNBT/SELG (P) 242/13 | KERJA KERJA MEROMBAK RAWAT UNTUK PEMUTUS LITAR JENIS REYROLLE UNTUK PEMUTUS LITAR 110 DI PMU TELUK PANGLIMA GARANG DI BAWAH JAGAAN PEJABAT PENGURUS NEGERI (SELANGOR), JABATAN SENGGARAAN ASET, BAHAGIAN PENGAHANTARAN TNB. | 29 May 2013 | View details |
| TNBT/SELG (P) 2/14 | KERJA KERJA MEMBEKAL PERALATAN PENGUJIAN CONTACT RESISTANCE UNTUK PASUKAN PENCAWANG BAGI JABATAN SENGGARAAN ASET (SELANGOR), BAHAGIAN PENGHANTARAN TNB. | 29 May 2013 | View details |
| TNBT/SELG (P) 1/14 | KERJA KERJA MEMBEKAL PERALATAN PENGUJIAN SF6 ANALYZER (PERCENTAGE & DEW POINT) UNTUK PASUKAN PENCAWANG BAGI JABATAN SENGGARAAN ASET (SELANGOR), BAHAGIAN PENGHANTARAN TNB. | 29 May 2013 | View details |
| TNBT/KL(TC) 13/13 | KERJA-KERJA MEMBEKAL, MENGHANTAR DAN MEMASANG SEHINGGA LENGKAP PERALATAN-PERALATAN PEJABAT IAITU KERUSI DAN MEJA KOMPUTER BAGI YARD UNIT TELEKONTROL DI BANGUNAN PENCAWANG MASUK UTAMA PANTAI BAGI PEJABAT PENGURUS NEGERI (KUALA LUMPUR) BAHAGIAN PENGHANTARAN TNB | 29 May 2013 | View details |
Payments for the tender document should be made in Cash / Bank Drafts / Cashier’s Order at the following time:-
| Monday - Thursday | 8.00 a.m - 1.00 p.m |
| 2.00 p.m - 5.00 p.m. | |
| Friday | 8.00 a.m - 12.00 noon |
| 2.30 p.m - 4.30 p.m. |
Payments made are not refundable.
Tenderers are required to produce the original certificate of registration and photocopy with KK/PKK/TNB and CIDB when buying the tender documents.
Tenaga Nasional Berhad does not bind itself to accept the lowest or any tender nor to assign any reason for the rejection of any tender nor will it be responsible for any cost incurred by the tenderers.