Home > Business > For Industrial > Pricing & Tariff

Pricing & TariffPrint this page 

 


Industrial

TARIFF CATEGORY
UNIT
RATES
1. Tariff D - Low Voltage Industrial Tariff  
For Overall Monthly Consumption Between 0-200 kWh/month  
For all kWh
sen/kWh
34.5
The minimum monthly charge is RM7.20  
For Overall Monthly Consumption More Than 200 kWh/month  
For all kWh (From 1kWh onwards)
sen/kWh
37.7
The minimum monthly charge is RM7.20  
Tariff Ds – Special Industrial Tariff (for consumers who qualify only)  
For all kWh
sen/kWh
35.9
The minimum monthly charge is RM7.20  
2. Tariff E1 - Medium Voltage General Industrial Tariff  
For each kilowatt of maximum demand per month
RM/kW
25.3
For all kWh
sen/kWh
28.8
The minimum monthly charge is RM600.00
Tariff E1s – Special Industrial Tariff (for consumers who qualify only)  
For each kilowatt of maximum demand per month
RM/kW
19.9
For all kWh
sen/kWh
28.3
The minimum monthly charge is RM600.00  
3. Tariff E2 - Medium Voltage Peak/Off-Peak Industrial Tariff
For each kilowatt of maximum demand per month during the peak period
RM/kW
31.7
For all kWh during the peak period
sen/kWh
30.4
For all kWh during the off-peak period
sen/kWh
18.7
The minimum monthly charge is RM600.00  
Tariff E2s – Special Industrial Tariff (for consumers who qualify only)  
For each kilowatt of maximum demand per month during the peak period
RM/kW
27.7
For all kWh during the peak period
sen/kWh
28.3
For all kWh during the off-peak period
sen/kWh
16.1
The minimum monthly charge is RM600.00  
4. Tariff E3 - High Voltage Peak/Off-Peak Industrial Tariff  
For each kilowatt of maximum demand per month during the peak period
RM/kW
30.4
For all kWh during the peak period
sen/kWh
28.8
For all kWh during the off-peak period
sen/kWh
17.3
The minimum monthly charge is RM600.00  
Tariff E3s – Special Industrial Tariff (for consumers who qualify only)  
For each kilowatt of maximum demand per month during the peak period
RM/kW
24.4
For all kWh during the peak period
sen/kWh
26.7
For all kWh during the off-peak period
sen/kWh
14.7
The minimum monthly charge is RM600.00 

Notes: SIT has a 2% higher increase than normal Industrial tariff in line with the Government's effort to gradually phase out the SIT subsidy

Back to top

Mining

TARIFF CATEGORY
UNIT
RATES
1. Tariff F - Low Voltage Mining Tariff  
For all kWh
sen/kWh
32.6
The minimum monthly charge is RM120.00  
2. Tariff F1 - Medium Voltage General Mining Tariff  
For each kilowatt of maximum demand per month
RM/kW
18.1
For all kWh
sen/kWh
26.8
The minimum monthly charge is RM120.00  
3. Tariff F2 - Medium Voltage Peak/Off-Peak Mining Tariff  
For each kilowatt of maximum demand per month during the peak period
RM/kW
25.5
For all kWh during the peak period
sen/kWh
268
For all kWh during the off-peak period
sen/kWh
14.7
The minimum monthly charge is RM120.00  

Back to top

Specific Agriculture

TARIFF CATEGORY
UNIT

RATES

1. Tariff H – Low Voltage Specific Agriculture Tariff  
For overall montly consumption between 0 - 200 kWh per month:
For all kWh
sen/kWh
36.9
The minimum monthly charge is RM7.20  
For overall montly consumption more than 200 kWh per month:
For all kWh
sen/kWh
40.3
The minimum monthly charge is RM7.20  
2.
Tariff H1 - Medium Voltage General Specific Agriculture Tariff  
For each kilowatt of maximum demand per month
RM/kW
25.9
For all kWh
sen/kWh
30.0
The minimum monthly charge is RM600.00  
3. Tariff H2 - Medium Voltage Peak/Off-Peak Specific Agriculture Tariff  
For each kilowatt of maximum demand per month during the peak period
RM/kW
34.9
For all kWh during the peak period
sen/kWh
31.2
For all kWh during the off-peak period
sen/kWh
19.2
The minimum monthly charge is RM600.00  

Back to top

Top-Up and Standby

“Co-generator” means a generator who uses a single primary energy source to generate sequentially two different forms of useful energy for its own use at an efficiency rate of more than 70%. Services offered to co-generators are:

Top-up supply:

The additional supply required by a Co-generator who does not produce sufficient electricity for its own use. 

Standby supply:

The supply that TNB provides to a Co-generator in the event that the Co-generator does not generate electricity due to plant failure or planned shutdown for maintenance. The Co-generator has a choice of firm or non-firm supply. Non-firm standby means that TNB does not guarantee that supply can be given when the Co-generator fails or is shutdown for maintenance. 

TARIFF CATEGORY
UNIT
RATES
Top-Up Standby
1. Tariff C1 - Medium Voltage General Commercial Tariff     
Maximum demand charge per month
RM/kW
25.9 14.0
For all kWh
sen/kWh
31.2  
2.
Tariff C2 - Medium Voltage Peak/Off-Peak Commercial Tariff    
For each kilowatt of maximum demand per month during the peak period
RM/kW
38.6 14.0
For all kWh during the peak period
sen/kWh
31.2  
For all kWh during the off-peak period
sen/kWh
19.2  
3. Tariff E1 - Medium Voltage General Industrial Tariff     
Maximum demand charge per month
RM/kW
25.3 14.0
For all kWh
sen/kWh
28.8  
4. Tariff E2 – Medium Voltage Peak/Off-Peak Industrial Tariff    
For each kilowatt of maximum demand per month during the peak period
RM/kW
31.7 14.0
For all kWh during the peak period
sen/kWh
30.4  
For all kWh during the off-peak period
sen/kWh
18.7  
5. Tariff E3 – High Voltage Peak/Off-Peak Industrial Tariff    
For each kilowatt of maximum demand per month during the peak period
RM/kW
30.4 12.0
For all kWh during the peak period
sen/kWh
28.8  
For all kWh during the off-peak period
sen/kWh
17.3  
6.
Tariff F1 – Medium Voltage General Mining Tariff     
Maximum demand charge per month
RM/kW
18.1 14.0
For all kWh
sen/kWh
26.8  
7. Tariff F2 – Medium Voltage Peak/Off-Peak Mining Tariff    
For each kilowatt of maximum demand per month during the peak period
RM/kW
25.5 14.0
For all kWh during the peak period
sen/kWh
26.8  
For all kWh during the off-peak period
sen/kWh
14.7  

Notes:

  1. This new Standby rate (as of 1 June 2011) is applicable to the following customers:
    • All new co-generation customers; and
    • Existing co-generation customers who wish to migrate to this new Standby rate
  2. For existing co-generation customers who wish to maintain the previous Standby (Firm & Non-Firm) rates, the previous Standby (Firm & Non-Firm) rates together with the new Top-Up rate (as of 1 June 2011) will be applicable
  3. 1% as Feed-in-Tariff (FiT) for RE Fund will be imposed on consumers' monthly bill (excluding Domestic consumers with monthly consumption of 300kWh and below) effective 1st December 2011

Back to top