Tender Notices
Tenders are invited from suppliers / contractors registered with the Ministry of Finance (MOF) or Kementerian Kewangan (KK) / Pusat Khidmat Kontraktor (PKK), Tenaga Nasional Berhad (TNB) and Construction Industry Development Board Malaysia (CIDB) for supply / work as follows:-
| Tender No | Tender Title | Closing Date | |
|---|---|---|---|
| T1041512 (TNBT /IP/201/ 2012/JTK) | Kerja-Kerja Membekal, Memasang Dan Memulatugas ‘Remote Terminal Unit’ Di PMU Kuala Kangsar (KKSR) Dan Temoh (TMOH) Untuk Jabatan Senggaraan Aset (Perak), Bahagian Penghantaran | 22 May 2012 | View details |
| T1012512 | PEMBELIAN DUAL FUNCTION POWER METER | 22 May 2012 | View details |
| TNB/SMK(ILS)KS(Q)204/2012 | Membekal dan menghantar 4 unit rak almari untuk kegunaan surau- surau di TNB Integrated Learning Solution Sdn. Bhd. - ILSAS, Bangi Selangor Darul Ehsan. | 22 May 2012 | View details |
| TNB/SMK(ILS)UPH 200/2012 | Supply, Install & Commissioning Of New Exhaust Hood And Accessories At Kitchen For TNB Integrated Learning Solution Sdn. Bhd. - ILSAS, Bangi Selangor. |
22 May 2012 | View details |
| TNBG/PROC 18/12 | KERJA-KERJA NAIK TARAF UNTUK BILIK MESYUARAT HELANG & HARIMAU, ARAS 6, BANGUNAN PENJANAAN, TNB | 22 May 2012 | View details |
| TNBT/KBRU/LINE 91/2012 (Q) | KERJA-KERJA MENYEWA PERKHIDMATAN HELIKOPTER BAGI PEMERIKSAAN KERJA-KERJA RONDAAN DAN RENTIS DI TALIAN 275KV DAN 132KV UNTUK JABATAN SENGGARAAN ASET KELANTAN,TNB. | 22 May 2012 | View details |
| TNBT/NS/ADMIN(Q) 177/2012 | KERJA-KERJA PENYELENGGARAAN SISTEM PENCEGAH KEBAKARAN JENIS AUTOMATIK DAN MUDAH ALIH SERTA PERKAKAS YANG BERKAITAN DENGANNYA DI PEJABAT PENGURUS NEGERI (NEGERI SEMBILAN), JABATAN SENGGARAAN ASET BAHAGIAN PENGHANTARAN, TNB UNTUK TAHUN 2012/2013 | 22 May 2012 | View details |
| TNBH/SSJCH 24/2012 (Q) | MENGAMBIL DAN MELUPUSKAN MINYAK DAN COTTON RAG TERPAKAI DI STESEN -STESEN JANAELEKTRIK CAMERON HIGHLANDS | 22 May 2012 | View details |
| RHQTM12042 | SUPPLY OF STAINLESS STEEL PIPE AND RODS SS310 FOR FABRICATION OF BOILER GUNS FOR 3, TNB JANAMANJUNG | 22 May 2012 | View details |
| TNBG/SJP 28-2012 | VARIOUS SPARE FOR ELECTRICAL SECTION AT STESEN JANAELEKTRIK SULTAN ISMAIL, PAKA, TERENGGANU | 23 May 2012 | View details |
| TNBJ/SJM101/12 | TO SUPPLY MANPOWER AND MATERIALS FOR CARRYING OUT MAINTENANCE AND REPAIR SERVICES FOR VALVE ACTUATORS AT COAL & ASH AREA DURING UNIT 3 MAJOR OVERHAUL. |
23 May 2012 | View details |
| T1043512 (TNBJ/SJM 101/12) | Tawaran Membekal Perkhidmatan Khusus Untuk Seksyen Senggaraan Alatan Dan Kawalan, Stesen Janakuasa Sultan Azlan Shah, Manjung. - To Supply Manpower And Materials For Carrying Out Maintenance And Repair Services For Valve Actuators at Coal & Ash Area During Unit 3 Major Overhaul |
23 May 2012 | View details |
| TNBG/CBS/Q048/2012 | TO SUPPLY PRESSURE GAUGE AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG SELANGOR DARUL EHSAN. | 23 May 2012 | View details |
| TNBG/CBS/Q069/2012 | TO SUPPLY DISPOSABLE OVERALL AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG SELANGOR DARUL EHSAN. | 23 May 2012 | View details |
| TNBG/CBS/Q078/2012 | TO SUPPLY CASTROL LUBRICANT OIL AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG SELANGOR DARUL EHSAN. | 23 May 2012 | View details |
| TNBG/CBS/Q079/2012 | TO SUPPLY ELECTRON SOLVENT AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT KLANG, SELANGOR DARUL EHSAN. | 23 May 2012 | View details |
| TNBG/CBS/Q080/2012 | TO SUPPLY BEARING AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT KLANG SELANGOR DARUL EHSAN. | 23 May 2012 | View details |
| TNBT/SELG (P) 189/12 | KERJA KERJA MEMBERSIH BANGUNAN GIS DI DALAM PENCAWANG MASUK UTAMA (PMU) DI BAWAH JAGAAN SENGGARAAN ASET (SELANGOR), BAHAGIAN PENGHANTARAN TNB. | 23 May 2012 | View details |
| TNBG/CBS/Q067/2012 | TO SUPPLY AIR PRESSURE REGULATOR AT STESEN JANAELEKTRIK JAMBATAN CONNAUGHT, KLANG, SELANGOR DARUL EHSAN. | 23 May 2012 | View details |
| TNBJ/SJM/16.13.1/3439 | ELECTROCHLORINATION PLANT HMI RETROFITTING AND PROGRAM MODIFICATION AT SJSAS. | 23 May 2012 | View details |
| TNBJ/SJM16.13.1/3440 | TO SUPPLY, INSTALL, TEST AND COMMISSION ADDITIONAL LIGHTINGS AND SWITCHED SOCKET OUTLETS AT BOPM WORKSHOP. | 23 May 2012 | View details |
| TNBJ/SJM16.13.1/3441 | TO SUPPLY, INSTALL, TEST AND COMMISSION ADDITIONAL LIGHTINGS AT MAIN STORE. | 23 May 2012 | View details |
| TNBJ/SJM/16.13.1/3442 | CBD TO IBD CLARINET HEADER PIPING REPLACEMENT DURING UNIT 3 MAJOR OVERHAUL (25/5/2012 -22/8/2012). | 23 May 2012 | View details |
| TNBJ/SJM16.13.1/3443 | SEWAAN FORKLIFT 5TAN UNTUK ROMBAKRAWAT UNIT 3 (25 MEI 2012 – 22 OGOS 2012). |
23 May 2012 | View details |
| TNBJ/SJM16.13.1/3445 | TO PURCHASE CONTROL FLUID AIR BREATHER (DES-CASE) FOR TURBINE MAINTENANCE SECTION. | 23 May 2012 | View details |
Payments for the tender document should be made in Cash / Bank Drafts / Cashier’s Order at the following time:-
| Monday - Thursday | 8.00 a.m - 1.00 p.m |
| 2.00 p.m - 5.00 p.m. | |
| Friday | 8.00 a.m - 12.00 noon |
| 2.30 p.m - 4.30 p.m. |
Payments made are not refundable.
Tenderers are required to produce the original certificate of registration and photocopy with KK/PKK/TNB and CIDB when buying the tender documents.
Tenaga Nasional Berhad does not bind itself to accept the lowest or any tender nor to assign any reason for the rejection of any tender nor will it be responsible for any cost incurred by the tenderers.