FOR POWER OUTAGE OR BREAKDOWN, PLEASE CALL 15454
FOR POWER OUTAGE OR BREAKDOWN,
PLEASE CALL 15454

Tender Notices

Find out about tender notices here.
READ MORE

View All

Tender No. Tender Info
RFX 4000054029 KONTRAK SATU (1) TAHUN PERKHIDMATAN SENGGARAAN KAWASAN, LANSKAP, BANGUNAN DAN PEMBEKALAN TENAGA KERJA TEKNIKAL DI STESEN JANAKUASA GELUGOR, TNB POWER GENERATION SDN. BHD.
RFX4000054069 KERJA-KERJA MEMBEKAL, MENGHANTAR IBC TANK SPILL CONTAINMENT PALLET DI LOKASI STOR WOE P&SC TNB.
RFX - 4000053978 TWO (2) YEARS CONTRACT TO SUPPLY HYDROCHLORIC ACID (HCI) 32% AT MANJUNG 1,2,3 & MANJUNG 4, STESEN JANAKUASA SULTAN AZLAN SHAH, TNB POWER GENERATION SDN. BHD.
RFx 4000054065 - SUPPLY OF HIGH WATER LEVEL (HWL) CONTROL VALVES SPARES PART FOR BOILER MAINTENANCE RFx 4000054065 - SUPPLY OF HIGH WATER LEVEL (HWL) CONTROL VALVES SPARES PART FOR BOILER MAINTENANCE SECTION, MANJUNG
TNBES-QM022/2026 PENJUALAN SEMULA PERALATAN ELEKTRIK TERPAKAI BAGI PROJEK BEKALAN ELEKTRIK LUAR BANDAR (BELB)
RFX4000054097 (TNB LABS Q20 2026) SUPPLY OF THREE-PHASE POWER QUALITY ANALYZER
TNB/ILS/IFM(JTEC) 247/2026 (NO. RFX : 4000054042) KERJA-KERJA MENUKAR CARPET BARU DI BILIK KELAS 1, BILIK KELAS 2, BILIK JURULATIH, KORIDOR, BILIK SERVER, BILIK MESYUARAT, BILIK PERBINCANGAN DAN PEJABAT PENTADBIRAN SERTA KERJA-KERJA YANG BERKAITAN DI TNB INTEGRATED LEARNING SOLUTIONS SDN. BHD. – ILSAS, KULAI, JOHOR DARUL TAKZIM.
TNBES-RFP001/2026 REQUEST FOR PROPOSAL (RFP) BAGI PELAKSANAAN PROOF OF CONCEPT (POC) PEMASANGAN OCCUPANCY SENSOR UNTUK HVAC OPTIMIZATION DI TNB PLATINUM HQ CAMPUS
RFX 4000053905 T-29163 PMU 132/33KV SUNGAI PINANG, PULAU PINANG - ASSET REPLACEMENT AND REFURBISHMENT FOR TRANSFORMER, PRIMARY AND SECONDARY EQUIPMENT, GRID DIVISION, TNB
RFx 4000054114 TOWER DEFECT RECTIFICATION WORKS FOR SKUNK CROSSARM TMGRKKSR/GRIK T12 GRID MAINTENANCE (NORTH), GRID DIVISION, TNB
RFX 4000054124 T-29328 CLOUDERA LICENSE RENEWAL
RFX 4000054001 T-29230 PEMBEKALAN DAN PENGIRIMAN OVERHEAD LINE ACCESSORIES UNTUK BAHAGIAN DISTRIBUTION NETWORK, TNB
RFX 4000054001 T-29230 PEMBEKALAN DAN PENGIRIMAN OVERHEAD LINE ACCESSORIES UNTUK BAHAGIAN DISTRIBUTION NETWORK, TNB
RFX 4000053962 T-29208 CADANGAN MEREKA BENTUK, MEMBINA DAN MENYIAPKAN TAPAK COMPACT SUB UNIT (CSU) JENIS PRECAST SERTA KERJAKERJA BERKAITAN DI DAERAH MANJUNG DAN TELUK INTAN, PERAK DARUL RIDZUAN UNTUK TETUAN TENAGA NASIONAL BERHAD.
RFX 4000054099 (TNBR/Q27/2026) SUPPLY, FABRICATION, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL AND CONTROL SYSTEM FOR COAL YARD WASTEWATER TREATMENT SYSTEM (CYWWTS)
RFX 4000053949-T-29201 PMU 132/11kV SUNGAI MATI, JOHOR - ASSET REPLACEMENT & REFURBISHMENT (R&R) FOR TRANSFORMER, PRIMARY AND SECONDARY EQUIPMENT.
RFX 4000053949-T-29201 PMU 132/11kV SUNGAI MATI, JOHOR - ASSET REPLACEMENT & REFURBISHMENT (R&R) FOR TRANSFORMER, PRIMARY AND SECONDARY EQUIPMENT.
RFx4000053906 To Establish a Cloud Operations and Resource Augmentation Services Contract for One (1) Year with Option to Extend for an Additional Year
RFX No. 4000054096 (T- 29300) KERJA PEMBAIKAN CERUN (TOWER FOUNDATION STABILIZER) DI T62 275kV TPAH-UJLI, GRID MAINTENANCE NORTH (SUBZONE IPOH), GRID DIVISION, TNB.
RFx 4000054125 TWO (2) YEARS CONTRACT FOR MAINTENANCE ENGINEERING, FABRICATION & MACHINING SERVICES CONTRACT FOR CONTROL & INSTRUMENT SECTION AT MANJUNG 5 POWER PLANT (SJSAS)
RFX-4000053833 M2MOFY27 - ELECTROSTATIC PRECIPITATOR (ESP) INSPECTION, REPAIR & SERVICING WORKS FOR BOILER MAINTENANCE SECTION-GF1 AT TNB JANAMANJUNG SDN BHD.
RFx 4000054136 SUPPLY OF AERATION FAN SPARE PARTS FOR BOILER MANTENANCE SECTION MANJUNG 4, STESEN JANAKUASA SULTAN AZLAN SHAH (SJSAS)
TNB/ILS/IFM (S) 291/2026 (IIS: TNB/ILS/INDEED F 0056/2026) (RFX: 4000054126) KERJA-KERJA ‘RECALIBRATION RELAY’ DAN PENYELENGGARAAN JANAKUASA TUNGGUSEDIA 500KVA SERTA KERJA-KERJA BERKAITAN DI TNB INTEGRATED LEARNING SOLUTIONS SDN. BHD. - ILSAS, BANGI, SELANGOR.
TNB/ILS/IFM 292/2026 (RFX NO. 4000054122) CADANGAN BAGI KERJA - KERJA MEMBAIKPULIH IREC SERTA KERJA - KERJA YANG BERKAITAN DI TNB INTEGRATED LEARNING SOLUTION SDN. BHD. – ILSAS BANGI, SELANGOR DARUL EHSAN
TNB/ILS/IFM(MN) 290/2026 (NO. RFX : 4000054128) CADANGAN KERJA-KERJA MEMBAIKPULIH BUMBUNG, RUANG MAKAN DAN TANDAS BENGKEL PENCAWANG SERTA KERJA-KERJA BERKAITAN DI TNB INTEGRATED LEARNING SOLUTION SDN BHD – ILSAS MALIM NAWAR, PERAK DARUL RIDZUAN.
RFX 4000053864 M2MOFY27 – ONE (1) YEAR CONTRACT FOR STEAM DRUM, LOWER DRUM, LOW PRESSURE (LP) & HIGH PRESSURE (HP) HEATERS, DEAERATOR, CONTINUOUS BLOWDOWN TANK, PIPING AND HEADERS REPAIR WORK FOR BOILER MAINTENANCE SECTION-GF1 AT TNB JANAMANJUNG SDN. BHD.
RFX4000053748 M2MOFY27 - INSPECTION, REPAIR, REPLACEMENT AND TESTING OF DRAUGHT SYSTEM (PA/FD/MISC) FOR BOILER MAINTENANCE SECTION - GF1 AT STESEN JANAKUASA SULTAN AZLAN SHAH, MANJUNG
RFx 4000053753 M2MOFY27 - BOILER PRESSURE AND NON-PRESSURE PARTS REPAIR WORKS FOR BOILER MAINTENANCE SECTION - GF1 AT TNB JANAMANJUNG SDN. BHD.
RFX 4000053662 M2MOFY27: HOT REHEAT PIPE (‘HRP’) REPLACEMENT WORKS DURING M2 MAJOR OVERHAUL (JANUARY 2027) FOR BOILER MAINTENANCE SECTION AT TNB AT STESEN JANAKUASA SULTAN AZLAN SHAH (SJSAS)
TNB/ILS/OME 249/2026 (IIS: TNB/ILS/HOPE F 0010/2026) (RFX: 4000054091) - ADDENDUM PERKHIDMATAN KAWALAN KESELAMATAN TANPA SENJATA DI TNB INTEGRATED LEARNING SOLUTION SDN. BHD. - ILSAS BANGI, SELANGOR DAN KULAI, JOHOR, DARUL TAKZIM.
RFX- 4000054026 M2MOFY27-INSULATION & CLADDING WORKS FOR BOILER MAINTENANCE SECTION - GF1 AT TNB JANAMANJUNG SDN. BHD.
RFX 4000054058 T-29267 PMU 132/33/11kV LEMAL, KELANTAN – EXTENSION OF 2 X 132KV UGC BAYS AND HYBRID UGC-OHL CONNECTION
RFx 4000054118 TO SUPPLY HOPPECKE GRID POWER VR L (OPZV) BATTERY BANK A AT MANJUNG 4, STESEN JANAKUASA SULTAN AZLAN SHAH (SJSAS)
RFX 4000054085 KERJA-KERJA MEMBAIKPULIH POS PENGAWAL SSD STESEN JANAKUASA SUNGAI PIAH HILIR, SSJ SUNGAI PERAK, SUNGAI SIPUT(U), PERAK DARUL RIDZUAN.
RFX 4000054044 TO PERFORM TEMPORARY CIVIL & CONSTRUCTION WORKS FOR MOBILE WATER TREATMENT SYSTEM PROJECT FOR GF2 OPERATION SECTION TNB JANAMANJUNG, STESEN JANAKUASA SULTAN AZLAN SHAH, MANJUNG.
RFX 4000053958 T-29205 PMU 132/33kV CENDEROH, PERAK - ASSET REPLACEMENT AND RELOCATION FOR TRANSFORMER, PRIMARY AND SECONDARY COMBINED EQUIPMENT
RFX No. 4000054142 (T- 29353) PEMBANGUNAN TAMAN INKLUSIF MESRA ORANG KURANG UPAYA (OKU) BANDAR BARU SALAK TINGGI.
RFX 4000054057 (T-29266) PMU 275/132kV SALAK TINGGI, SELANGOR – EXTENSION OF 3RD AUTOTRANSFORMER (SGT), ASSET REPLACEMENT AND REFURBISHMENT OF PRIMARY AND SECONDARY EQUIPMENT
RFX 4000054089 T-29293 ESTABLISHMENT OF PMU 500/275 KG AWAH GIS, PAHANG
RFX - 4000054073 KONTRAK DUA (2) TAHUN KERJA-KERJA PENYEDIAAN PERANCAH MANJUNG 4 UNTUK BAHAGIAN FACILITIES MANAGEMENT, STESEN JANAKUASA AZLAN SHAH, MANJUNG
RFX 4000054089 T-29293 ESTABLISHMENT OF PMU 500/275 KG AWAH GIS, PAHANG
TRe Land 07/2026 Identification of Potential Land for Future Large Scale Solar (LSS) Projects in Peninsular Malaysia


X

Business Opportunities

Check for business opportunities as a supplier here.
READ MORE

Managing the Supply Chain effectively has become ever more critical in today’s very competitive marketplace. For more than 60 years, TNB has been powering the nation’s progress and recognizes that success in this endeavor is supported by a strong supplier base. Without strong supplier relationships, especially in these challenging times, neither party will succeed.

By working together, TNB and its suppliers can both continue to grow in the future. Thus, we believe it is critical that our suppliers and contractors have a thorough understanding both of our business and our expectations of their performance.

Interested to explore business opportunities with TNB?

Definition

Supplier Individual

Companies or any parties supplying product to TNB.

Contractor Individual

Companies or any parties providing Works and Services to TNB.

Year:

View All

Description Date
View All
X

Our Requirements

This section explains our basic and mandatory requirements that suppliers must comply to before working with TNB. Click on any of the following links to get started.
READ MORE

This section explains our basic and mandatory requirements that suppliers must comply to before working with TNB. Click on any of the following links to get started.

Year:

View All

Description Date
View All
X

Procurement Process

This section will provide you with information on the end-to-end TNB procurement process. Click on any of the following links to get started.
READ MORE

This section will provide you with information on the end-to-end TNB procurement process. Click on any of the following links to get started.

Year:

View All

Description Date
View All
X

Policies and Procedures

Make sure you know the policies and procedures for suppliers.
READ MORE

Rules and regulations have been established for guidance and compliance by all suppliers/contractors. Penalties established for violations of the said rules and regulations are not meant to be punitive but corrective.

TNB shall take the appropriate measures against all erring suppliers in order to keep the integrity of its purchasing system and to maintain a pool of competent suppliers/contractors.

Sustainable Procurement Code of Conduct (SPCC)

TNB believes that all supplier/ contractor relationships should be based on principles of good governance such as integrity, accountability, fairness and a no tolerance rule towards bribery and corruption. These principles extend to all the company’s procurement activities in all countries in which it or its subsidiaries and majority- owned joint-venture companies operate. These principles are given force in a detailed Sustainable Procurement Code of Conduct (“SPCC”), which is constantly revised reflect duly the changes in law, reputational demands and changes in the business. All TNB employees, directors and suppliers/contractors are required to comply accordingly with SPCC.

Compliance With SPCC By Suppliers/Contractors

It is the responsibility of Suppliers/Contractors to ensure that its representatives understand and comply with SPCC.

In the event a breach has been committed, TNB has the right to take any action that TNB deems fit against Suppliers/Contractors, which include:

  1. Suspension or termination of contract;
  2. Deduction of any amount of money paid or promised to be paid;
  3. Requiring Suppliers/ Contractors to substitute any representative who breaches the SPCC or acting inconsistent with SPCC; or
  4. Disqualify the Suppliers/Contractors, including those subjected to consequence management by TNB, from participating in any tender or procurement exercise.

Download the full TNB Sustainable Procurement Code of Conduct here. English | Bahasa Melayu

Year:

View All

Description Date
View All
X

Register as TNB Supplier

Find out how to register as a TNB Supplier.
READ MORE

Important Notice:

Introduction

Welcome to TNB Online Supplier Registration

Thank you for your interest to become a Supplier to TNB, For smooth registration, please ensure

  1. You have readily scanned all certified supporting documents
  2. You have entered and attached all the necessary documents and information. Upon full comprehension of the reading materials, please proceed to enter your data and complete this activity by selecting the ‘Send’ button at the end of the registration page.

Banking Notice :-

In line with government initiatives to reduce the use of cheques, TNB has provided direct crediting payments to the supplier account. Charges imposed by the bank shall be deducted, where applicable.

For fast crediting of payment, suppliers of TNB are encouraged to open a Maybank account.

 

Objectives

At TNB, we value the strong base of suppliers we have developed and upon whom we depend as they work reliably to help us meet the highest standards of service. We periodically review our relationships to ensure we continue to engage suppliers who are eager to be measured by their excellent service, on-time deliverables and competitive pricing.

With the implementation of Registration of Supplier [ROS], TNB and suppliers will be able to communicate on a single platform to bring advantage to all parties involved.

 

Benefits

  • Suppliers will be able to register online from wherever together with scanned supportive documentations
  • Suppliers will be able to print the registration certificate upon approval of the registration
  • Suppliers will be able to update and maintain their own company data in the system

Workflow

Registration of Supplier (ROS) Workflow

 

User Guide

  1. Overview of Supplier Registration
  2. Registration of Supplier : English | Bahasa Melayu
  3. TNB New/Renew Vendor Online Payment (FPX)
  4. Supplier First Time Login
  5. Creation of New User ID

Video Walkthrough

  1. Registration of Supplier  English | Bahasa Melayu
  2. Supplier First Time Login English | Bahasa Melayu
  3. TNB New/Renew Vendor Online Payment (FPX) English | Bahasa Melayu
  4. Maintain Supplier Certificates/Supplier Details English | Bahasa Melayu

Year:

View All

Description Date
View All
X

Supplier Relationship Management

Read on about supplier relationship management.
READ MORE

Overview Of SRM

Introduction

What is the Supply Chain Management (SCM) Project?

Procurement Division has charted its 5 years business plan for 2010-2015 with the full support of ICT Division, one initiative identified is the holistic implementation of the Supply Chain Management (SCM) Project.

This project framework is intended to provide the Procurement Division with the technological ability to implement best practice procurement processes, analyses and standardisation to create value opportunities and sustain efficiency, transparency and consistency.

What are the five modules in the SCM Project?

The SCM Project will acquire and implement a solution suite integrating to our existing application portfolios in accordance with the solution framework and will be implemented in 5 modules:

Intergrated solution suite

Objectives

  • To monitor policy and process compliance
  • To automate and improve operational business processes
  • To better manage vendor development programs
  • To give holistic visibility and control of suppliers in TNB
  • To give in-depth visibility into TNB’s procurement spends

Benefits

E-tendering / E-purchasing

Features:

  • Demand Aggregation.
  • Online RFXs & auctioning – allows buyers to establish sources of supply for works and services
  • Front and web enablement for full tender & award process using project management and document sharing facilities; functions for tenders/bids prequalification, comparison and evaluation.
  • Event-triggered workflow and notification.

Expected Benefits:

  • Shorter lead time from tender to award.
  • Improvement in the visibility, transparency and manageability of sourcing process.
  • Improvement in buyer negotiating power by embedding best practices sourcing techniques across enterprise.

 

Enterprise Contract Management

Features:

  • A central searchable database for all types of agreements.
  • Contract authoring – template supports and rule-based wizards for the full legal document.
  • Contract distribution, usage & renewal.
  • Performance & Compliance management – configurable alerts and notifications for milestones and renewal/expiration management.

Expected Benefits:

  • Centralization and search ability of all legal agreements in a single repository.
  • Ease of contract compliance monitoring by the alerting mechanism for milestones and renewal/expiration monitoring.

 

Supplier-Buyer Portal

Features:

  • Interactive platform for both buyers & suppliers.
  • Suppliers – register online, purchase tenders; participate in bids; download orders; view account & performance data; maintain profiles/catalogs; submit invoice, vendor complaint management.
  • Buyers – creating RFXs; requisitioning, order processing and approvals; contract administration and vendor evaluation.

Expected Benefits:

  • Accelerate the speed and accuracy of information exchange for both buyers and sellers.

 

Supplier Relationship Management

Features:

  • Online registration and document exchange capabilities.
  • Survey tool to gather feedback and manage qualitative data.
  • Functionality to track and manage supplier performance.
  • Platform for credentials management.
  • Alerting system for dates and milestones management.

Expected Benefits:

  • Enable supplier collaboration (on boarding and document exchange); segmentation and development; diversity and risk management; and performance management.

Spend Analytics

Features:

  • Spend Data Aggregation.
  • Data Cleansing & Enrichment.
  • Spend Analytics & Reporting.
  • Spend Initiative/Project Management.

Expected Benefits:

  • Enable identification and prioritization of cost savings opportunities.
  • Drives compliance to category sourcing strategy.
  • Avoid resources misallocation at early stage.

Ebook

User/Password

Suppliers need to register first using Registration of Suppliers (ROS) to obtain valid username and password.

 

Supplier Self Service (SUS)

Click button above to login into SUS Portal (for Vendors) and SRM /SPM (for TNB users)

Please click here for the guideline to remove system compatibility setting before login to the system

SUS Terms & Conditions [English | Bahasa Melayu]

Important Notice :

Introduction

Tenaga Nasional Berhad has developed Supplier Self Service (SUS). SUS is a hosted solution that reduces costs in the procurement cycle as it improves business document exchange and content flow. SUS is a hosted solution that reduces costs in the procurement cycle as it improves business document exchange and content flow. Supplier Self-Services can be accessed easily using a Web browser and is tailored for the procurement of goods as well as services.

This Web-based portal will offer our suppliers the opportunity to access their own purchase orders, invoice, and payment information through a secured login to the Portal.

With TNB Supplier Self Service Portal, you will be able to register for portal access using this website.

Objectives

Supplier Self Service (SUS) is a hosted solution that reduces costs in the procurement cycle as it improves business document exchange and content flow. SUS can be accessed easily using a Web browser and is tailored for the procurement of goods as well as services.

This Web-based portal will offer our suppliers the opportunity to access their own purchase orders, invoice, and payment information through a secured login to the Portal.

Benefits

  • Supplier can access system to view ePO, contract status, invoice status, payment status and new tender
  • Supplier can be submit tender/RFx on line
  • Supplier can initiate and post “details of technical work completion or material delivery”
  • Supplier can post invoice electronically
  • Supplier can receive PO acknowledgements and PO change communication

Workflow

Supplier Self Service (SUS) Workflow

 

Contract Lifecycle Management

TNB VENDOR

Click the related button above to login into CLM Portal

Notice: Access Changes In Contract Lifecycle Management (CLM) TNB

Introduction

Welcome to TNB Contract Lifecycle Management

Contract lifecycle management (CLM) is the proactive and collaborative, efficient management of a contract from initiation of Letter of Intent, Letter of Acceptance, Contract Document, Addendum/Variation Order until the closure of the contract.

CLM also manage the compliance of contract issues including Performance Security management, Assent to Deed of Assignment/Factoring, delay damages and termination of contract. Implementing CLM can lead to significant improvements in cost savings and efficiency.

Objectives

  • Contract Lifecycle Management (CLM) is designed to manage the contract life-cycle from the initiation of contract award up to the closure of the contract file through web-based portal
  • CLM would be able to assist the Supplier to collaborate and communicate with TNB besides to track the updated contract status
  • CLM can be effectively managing all types of contracts, including the automation of alerts and reminders to the Suppliers

Benefits

  • Supplier would be able to access system to view status of Letter of Intent, Letter of Acceptance, Addendum, Variation Order
  • Supplier would be able to review the contract status (documentation and enforcement)
  • Supplier would be able to collaborate with TNB on contract management issue through online
  • Supplier would be able to receive relevant notification and reminders in the system

User Guide

A. General

  1. Protection of the System Security via Password Management
  2. Registration Guidelines : English | Bahasa Melayu
  3. Certificate Renewal Guidelines: English | Bahasa Melayu
  4. Supplier First Time Login
  5. Update Company Information
  6. Creation of Sub IDs
  7. Maintain Supplier Certificates/ Supplier Details
  8. TNB New/Renew Vendor Online Payment (FPX)
  9. Preview and Print Approved Certificate
  10. Sijil Guna Pakai (SGP)

B. eTender

  1. Single Envelope - Bidder Intent, Participate, Create and Submit Respond
  2. Two Envelope - Bidder Intent, Participate, Create and Submit Respond

User Manual

  1. Single Envelope - Bidder Intent, Participate, Create and Submit Respond
  2. Two Envelope - Bidder Intent, Participate, Create and Submit Respond
  3. User Guide (Supplier) - TNB eTender Online Payment (FPX)
  4. User Guide (External) - Public Tender Participation
  5. User Guide - Tender (Contract Paperless)
  6. User Guide - Tender Submission (Procurement Cycle Digitalization – PCD)

C. ePO/ e-Invoice Related

  1. Acknowledge Purchase Order (PO)
  2. Initiate & Resubmit Service Entry (SE)
  3. Initiate & Resubmit Service Entry (only for DN)
  4. Accept Good Receipt (GR)
  5. Create & Resubmit Invoice New
  6. E-Invoice for Blanket Purchase Order
  7. Check Payment Status
  8. FAQ for e-invoice
  9. Info Pack

Introduction to e-Invoice : English | Bahasa Melayu

  1. Acknowledge PO : English | Bahasa Melayu
  2. Initiate Service Entry : English | Bahasa Melayu
  3. Partial Service Entry : English | Bahasa Melayu
  4. Create Invoice Service SST : English | Bahasa Melayu
  5. Create Invoice Service Without SST : English | Bahasa Melayu
  6. Accept Good Receipt : English | Bahasa Melayu
  7. Create Invoice Material SST : English | Bahasa Melayu
  8. Create Invoice Material Without SST : English | Bahasa Melayu
  9. Check Payment : English | Bahasa Melayu
  10. ADOA : English | Bahasa Melayu
  11. Retention Sum PO : English | Bahasa Melayu
  12. Retention Sum Invoice : English | Bahasa Melayu

D. Contract Lifecycle Management (CLM)

  1. CLM Supplier Manual

Video Walkthrough

A. ePO

  1. Material ePO
  2. Service ePO

     

Single Service Desk (SSD), TGBS

TNB Suppliers who may have queries or need clarifications please contact our Single Service Desk (SSD) team via:-

phone 03 Tel: +603 - 8929 9595

mail Email: Please make sure only one of these email addresses is in the "To" field, if there are other emails, please enter in "cc" field

Year:

View All

Description Date
View All
X