RM18 Million for Tenaga Hub
12/05/2015
Tenaga Nasional Berhad (TNB) customer service centres will go through a face-lift and be re-branded as Tenaga Hubs at a total cost of RM18 million, in a bid to provide excellent customer service.
“More than RM1.5 million is being spent on each Energy Hub and is expected to be completed by 2017.” Dr Maximus Johnity Ongkili Minister of Energy, Green Technology and Water said at the opening of the Subang Tenaga Hub in Subang Jaya, today.
For more detail: File