FOR POWER OUTAGE OR BREAKDOWN,
PLEASE CALL 15454

TNB’s Jimah East Power Fully Operational

30/12/2019

The second of two coal-fired power plants owned and run by Tenaga Nasional Bhd’s (TNB) subsidiary, Jimah East Power Sdn Bhd (JEP) has commenced its Commercial Operation Date (COD) on Friday, 27th December 2019.

With the powering up of the 1,000 megawatt (MW) plant, TNB has reinforced Peninsular Malaysia's power supply to 25,981 MW.



For more detail: File