FOR POWER OUTAGE OR BREAKDOWN,
PLEASE CALL 15454

Sultan Ibrahim Power Plant Strengthens Electricity Supply, Low Carbon Commitment

22/03/2022

Tenaga Nasional Berhad (TNB) achieves another milestone in its low carbon commitment with the launch of an advanced gas turbine power plant in Pasir Gudang, Johor, today.

The launch was officiated by The Sultan of Johor, Sultan Ibrahim Ibni Almarhum Sultan Iskandar, whose pleased to name the station Sultan Ibrahim Power Plant, in conjunction with His Royal Highness’ Official Birthday this year.

Sultan Ibrahim spent almost an hour at the station, the first commercial power plant in the world to use the latest and most technologically efficient 9HA.02 gas turbine produced by General Electric (GE).

Its natural gas fuel combustion technology is capable of generating more than 60 percent of electricity, an efficiency that contributesto lower carbon footprint, living up to its slogan, Ecofriendly Energy, For Sustainable Development (Tenaga Mesra Alam, Demi Pembangunan Mampan).



For more detail: File
Untuk ketahui lebih lanjut: File